Leading Family Hotel & Resort DACHSTEINKÖNIG

Reconstruction of children's hotel and chalets in Gosau am Dachstein (Styria, Austria)

The main building with its two subterranean and three surface floors was executed as  a reinforced concrete construction, the two-story chalets as massive construction/wooden construction.

The poor soil condition in the building area demanded extensive soil stabilisation measures as well as pile foundations.
Construction components and systems such as a dense execution of building components touching the ground ("white tank"), linear and point supported ceiling systems, semi-precast components with large unsupported span widths and much more were planned according to the state of the technology.

Also worth noting are the extraordinary dimension and short construction period as well as the complexe and extensive design.
Baucon did the first draft up to the executional planning of the whole supporting structure as well as the building supervision in coordination with consultants and executing companies.

Informationen über die Verwendung von Cookies!
Diese Website verwendet eine begrenzte Anzahl an Cookies, um Ihr Browsing zu verbessern. Weitere Informationen (auch über den Widerruf Ihrer Zustimmung) entnehmen Sie bitte unseren Cookie-Richtlinien. Durch Anklicken von "Akzeptieren" bestätigen Sie, dass Sie der Nutzung von Cookies gemäß unseren Cookie-Richtlinien zustimmen und diese gelesen haben.